September 2024 Goals
September 2024 goals and daily notebook entries.
Goals
Writing and manuscripts
- Dissertation proposal submission to grad school
- IDP + plan outline
- Post doc fellowship apps
- e5 ncRNA complete draft
- Pacuta manuscript submission
Sample processing
- Re-amp 6 WGBS e5 deep dive samples
- Phys stuff for AST and Mcap DT
- Find and send DNA for e5 samples
- Metabolomics test samples for e5 time series
Data analysis
- 3’UTR for AST 2021 (GENE EXT) and rerun miRanda with that info
- Apul methylation w/ pacbio tools
- Compiling all phys stuff for AST 2021
Field work / travel
- Figure out travel for cbass workshop
- Apply for travel $$$ for cbass workshop
- Apply for travel $$$ for sicb
Daily log
20240901
- Installing gene ext again, failed
- Writing some NSF PRFB ideas
- Apul genome methylation initial analysis
- DESeq2 with shortstack miRNA output
- Started UNCW cover letter
20240902
- Separations for metabolomics samples
- Edits to Pacuta 2022 intro
- UNCW cover letter
- Mote cover letter
- Created shipping label for test metabolomics samples tomorrow
20240903
- Shipped test metabolomics samples
- New grad student tour
- Shipped corals
- Talked w Zoe re cover letters
- BES retreat
20240904
- Resubmitted Bermuda TER
- Looking over e5 timeseries RNA QC
- Closed some deep dive e5 github issues
- Updated EHS refresher training
- Finished UNCW cover letter
20240905
- Picked up science saturday shirts
- Random science saturday stuff
- Nanodropped DNA samples and WGBS libraries
- Wrote up nanodrop post
- Submitted UNCW app!!!!!!
- Worked on JEB travel app
20240906
- submitted time sheet
- JEB travel app
- e5 meeting
- piRNA closest
- steven meeting
20240907
- Science saturday
20240908
- Metabolomics separations + shipping prep
- A few edits to Pacuta paper intro
- JEB travel app
20240909
- Shipped metabolomics samples
- Lab meeting
- Organizing go stuff for ncRNA closest gene
- Storage inventory
20240910
- Trinity meeting
- Location of soft-masked genome:
/data/putnamlab/tconn/repeats/apul_softmasked/apul.hifiasm.s55_pa.p_ctg.fa.k32.w100.z1000.ntLink.5rounds.fa.masked
- Location of soft-masked genome:
- Looking into pacbio methylation analysis
- Writing for apul genome paper
- Sent JEB info to Hollie
- GO enrichment code
- Therapy
- Booked maldives flights
20240911
- Writing accountability - dissertation proposal + sent to Hollie
- GO enrichment for genes closest to ncRNAs in genomes e5 - made plots, updated manuscript
20240912
- Go enrichment figures + writing
- lncRNA bed closest + go enrichment + figures
- Attempted to run gene ext in Zoe’s directory, failed
- Results writing for e5 ncRNA paper
- Cleaning up methods + intro for e5 ncRNA paper
20240913
- IDP writing
- e5 ncRNA writing
- Remaking plots for e5 ncRNA
- posts for reefbites
- Talking w/ Danielle re her last chapter
20240915
- e5 writing
- IDP
- Coding for acute thermal stress HI 2022
- Mote cover letter
20240916
- JEB app
- Looking at e5 molecular sample stuff
- Genohub w/ Zoe
- SICB travel w/ Zoe
- Lab meeting
20240917
- Mote app
- Finished uploading assembled genome to NCBI
- Therapy
- e5 ncRNA paper writing
- Titration for QT
- Updating e5 ncRNA fig 1
20240918
- Writing accountability - e5 ncRNA discussion
- Pacuta paper cleaning up results section
- Tried to run jasmine on raw hifi reads, failed
- Made table for Pacuta paper
- JEB app
- Helping with various lab things
20240919
- Writing meeting
- Pacuta paper intro
- PACUTA LARVAE!!!!!
- NSF PRFB webinar
- DT MCAP seq data received!!!
- QCed Mcap seq data
- Jackie meeting
20240920
- Looking at e5 ncRNA stuff
- DIBP
- e5 meeting
- Worked on e5 ncRNA paper
- Changed water out for larvae in plates 1+2 and added substrate for larvae in plates 3+4
- Colloquium
20240921
- Water change for larvae
20240922
- Water change for larvae
20240923
- Re-Qubit for e5 DNA
- Aquarium room stuff
- Looking at e5 DNA timeseries stuff
- Lab meeting
- Remaking e5 figs
20240924
- Remaking e5 figs
- Emails + admin stuff
- Submitted Mote app
- Looking at PacBio methylation info + downloading bunch of pb tools to andromeda
- Aligning pacbio bam to reference for meth analysis
20240925
- DNA extractions for e5
- Water change for larvae
- Read Chloe GRFP app
- Looking at cpg-tools output for Apul
20240926
- QC DNA
- Methods and results for Apul methylation
- Notebook post for extractions
- PacBio methylation meeting
- QC mcap data
20240930
- Aquarium room stuff
- Lab meeting
- Looked at Mcap QC
- Prep for e5 writing retreat
- Apul methylation + gene intersect
- Outline for lab meeting next week
September reflection
How did I do with my goals for this month?
Writing and manuscripts
- Dissertation proposal submission to grad school - nope, on Hollie’s desk
- IDP + plan outline - yes kinda. No plan outline but have some rough dates
- Post doc fellowship apps - no lol. Probably wont apply this cycle because I am overwhelmed
- e5 ncRNA complete draft - kinda? Basically there
- Pacuta manuscript submission - nope but getting close
Data analysis
- 3’UTR for AST 2021 (GENE EXT) and rerun miRanda with that info - nope. tried to install but lots of fails. May just have zoe run it
- Apul methylation w/ pacbio tools - yes!!!
- Compiling all phys stuff for AST 2021 - nope
Sample processing
- Re-amp 6 WGBS e5 deep dive samples - kinda. I have done some troubleshooting but will figure out how to move forward next week
- Phys stuff for AST and Mcap DT - nope
- Find and send DNA for e5 samples - kinda? Did some re-extractions on POR samples, now need to decide how to move forward
- Metabolomics test samples for e5 time series - yes
Field work / travel
- Figure out travel for cbass workshop - yes, flights booked
- Apply for travel $$$ for cbass workshop - application in the works
- Apply for travel $$$ for sicb - yes
I got a lot of writing done this month! Several manuscripts are close to submission. I’m also happy that the methylation for the Apul genome is complete.
Written on September 1, 2024